<<Return to Overview


The recent and ongoing 2007-2008 drill hole program (holes K-07-14 to K-08-46) is headed by Linear Metals.  Holes K-04-01 to K-04-13 was completed by Noranda/Falconbridge in 2004-2005. 

KM61 Drill Hole Results 2004-2005

 
 
 
Hole ID From (metres) To (metres) Thickness (metres) Molybdenum (%) Copper (%) Silver (g/t)
K-04-02
  7.3 111 103.7 0.005 0.039  
Including 105 111 6 0.011 0.094  
  121.2 126.8 5.6 0.013 0.066  
K-04-03
  153.3 206.6 53.3 0.046 0.048  
  217.5 252 34.5 0.048 0.083  
Including 231 242.5 11.5 0.104 0.16  
K-04-04/4A
  4.3 27.6 23.3 0.038 0.091  
  42.4 165.5 123.1 0.047 0.076  
K-04-05
  25.5 154.5 129 0.009 0.055  
  190.5 195 4.5 0.081 0.211  
  212.8 213.9 1.1 0.012 0.127  
  214.4 216 1.6 0.015 0.088  
  217.5 222.8 5.3 0.087 0.172  
K-05-06
  76.5 112.5 36 0.017 0.085  
  127.5 133.5 6 0.011 0.128  
  142.5 151.5 9 0.023 0.098  
  182.4 243.6 61.2 0.075 0.188  
  257.4 266 8.6 0.066 0.156  
  300.6 306.5 5.9 0.079 0.054  
K-05-06 (2007 Assay Results)
  183.3 326.5 143.2 0.068 0.14 6.1
K-05-07
  91.9 220.7 128.8 0.058 0.122  
K-05-07 (2007 Assay Results)
  39 232.6 193.6 0.052 0.11 7.1
K-05-08
  44.4 60.7 16.3 0.352 0.066  
Including 46.5 49.5 3 1.78 0.077  
Including 48 52.5 4.5 0.852 0.128  
  71.2 75.7 4.5 0.018 0.104  
  137.3 161.2 23.9 0.043 0.122  
K-05-08 (2007 Assay Results)
  34 75.7 41.7 0.15 0.052 3.1
Including 46.5 49.5 3 1.78 0.08 5.5
  137.3 176.6 39.3 0.041 0.11 4.8
K-05-09
  51 81.7 30.7 0.028 0.133  
Including 64.7 72 7.3 0.014 0.256  
  163 197.4 34.4 0.012 0.037  
K-05-09 (2007 Assay Results)
  6.2 81 74.8 0.039 0.09 3.9
K-05-10
  8.3 61.6 53.3 0.033 0.105  
  122.6 133.7 11.1 0.016 0.11  
K-05-10 (2007 Assay Results)
  5.65 59.9 54.25 0.035 0.11 7.1
K-05-11
  92 146.6 54.6 0.012 0.056  
  166.9 209.7 42.8 0.015 0.021  
K-05-12
  60 66.8 6.8 0.003 0.062  
  100.5 108 7.5 0.013 0.12  
  235.1 251.9 16.8 0.255 0.121  
Including 241.5 244.4 2.9 1.412 0.289  
Note: Silver composites from the previously sampled 2004-5 core are in progress.
 
 
 
 

KM61 Drill Hole Results 2007-2008

 
 
 
Hole ID From (metres) To (metres) Thickness (metres) Molybdenum (%) Copper (%) Silver (g/t) Comments
K-07-14 50 59.7 9.7 0.05 0.08 1.3 Bottomed in mineralization
  77.6 82.1 4.5 0.03 0.24 5.1  
  87.95 119.45 31.5 0.07 0.08 1.7  
  133.3 251 117.7 0.054 0.16 3  
K-07-15 4 11.3 7.3 0.031 0.05 1 Bottomed in mineralization
  49.1 59.6 10.5 0.054 0.03 0.8  
  69.15 95 25.85 0.036 0.07 1.3  
  152.35 199.7 47.35 0.036 0.09 2.9  
K-07-16 17.95 24.5 6.55 0.048 0.06 2.2 Bottomed in mineralization
  28.2 98.2 70 0.047 0.09 3.5  
  109.5 122.8 13.3 0.032 0.1 3.7  
  128.7 215 86.3 0.075 0.13 3.3  
  219.1 320 100.9 0.046 0.09 2.2  
K-07-17 4.13 16.25 12.12 0.028 0.05 1.1 Bottomed in post-mineral dyke
  25.95 64.55 38.6 0.062 0.07 1.8  
  72.4 129.3 56.9 0.148 0.08 1.8  
  136.28 150.2 13.92 0.075 0.13 4.3  
K-07-18 2.3 95 92.7 0.058 0.08 2.6 Bottomed in Cu-rich mineralization
  133.8 147.6 13.8 0.022 0.06 2.4  
  147.6 236 88.4 0.038 0.06 2.2  
  236 251 15 0.027 0.1 2.7  
K-07-19 1.55 155 153.45 0.051 0.12 3.8 Bottomed in mineralization
K-07-20 5.25 14 8.75 0.068 0.05 18.9 Bottomed in mineralization
  26 81.17 55.17 0.043 0.11 2.6  
  98.2 104.28 6.08 0.044 0.13 3.3  
K-07-21 21 67.4 46.4 0.037 0.07 1.9 Bottomed in mineralization
K-07-22 24.55 41.2 16.65 0.039 0.09 1.6 Bottomed in mineralization
  52.83 59.9 7.07 0.049 0.08 2  
  67.5 72.85 5.35 0.036 0.16 4.2  
K-07-23 4 13.5 9.5 0.102 0.09 2  
 K-07-24 257.8 342.7 84.9 0.045 0.1 2.9 Bottomed in mineralization
K-07-25 288.45 350 61.55 0.065 0.12 3.1 Bottomed in mineralization
K-07-26 125.15 325.85 200.7 0.05 0.06 1.9 Bottomed in mineralization
K-07-27 134.5 263.6 129.1 0.06 0.07 2.6 Bottomed in mineralization
  277.6 343 65.4 0.062 0.06 1.2  
K-07-28 221 267.1 46.1 0.1 0.06 1.9 Bottomed in mineralization
  279.5 330.5 51 0.048 0.04 1.2  
K-07-29 228.5 239 10.5 0.091 0.09 3.9  
  363.4 374.7 11.3 0.106 0.17 6.7  
  447 535 88 0.042 0.12 4.1  
  542.1 598 55.9 0.038 0.11 3.3  
  655 761 106 0.034 0.07 2  
K-07-30*
K-07-31*
K-07-32*
K-07-33*
K-07-34 42 54.7 12.7 0.0421 0.08 2.7  
  71.8 186.5 114.7 0.088 0.10 3.4  
  71.8 186.5 114.7 0.061 0.10 3.4 Two samples cut to 0.5% molybdenum, uncut runs 0.088% Mo
  216.7 233.5 16.8 0.04 0.08 2.6  
  247.5 331.5 84 0.049 0.07 3.3 Bottoms in FWT(3)
CT     228.2 0.054 0.09 3.3  
K-07-35 87.5 94 6.5 0.104 0.03 0.9 With approximatly 100m wide envelope of 0.03% molybdenum
  176.5 195 18.5 0.048 0.08 2.9  
K-08-36 142 206.5 64.5 0.088 0.11 3.7  
  216.9 223.3 6.4 0.078 0.18 6.7  
  234.4 397 162.6 0.057 0.12 3.3 Two samples cut to 0.5% molybdenum, uncut runs 0.088% Mo
  415.9 426 10.1 0.039 0.11 1.6 Bottoms in 0.06% Mo at 443m
CT     243.6 0.065 0.12 3.4  
K-08-37 4.5 31.9 27.4 0.046 0.05 1.9  
  41.8 108.3 66.5 0.054 0.10 3.5  
  110.75 119 8.25 0.054 0.05 1.3  
  125 136 11 0.048 0.05 1.2  
  155.8 159.5 3.7 0.075 0.03 0.7  
CT     116.85 0.052 0.08 2.7  
K-08-38 2.25 113 110.75 0.033 0.08 2.4  
  160.35 173.8 13.45 0.047 0.04 1.2  
  181.5 201.1 19.6 0.045 0.09 2.1  
  214.7 230.1 15.4 0.067 0.12 3.4  
  269.5 384.5 115 0.051 0.15 3.6 Bottoms in FWT(3)
CT     163.45 0.051 0.13 3.2  
K-08-39 0.01% material, then in to sediments            
K-08-40 6.6 112.5 105.9 0.085 0.08 2.5  
  121.6 149.5 27.9 0.088 0.07 2  
  193.5 227.5 34 0.053 0.06 1.6 Includes dilution from 7.2m of dykes
  233.9 282 48.1 0.057 0.11 2.5 Bottoms in FWT(3)
CT     215.9 0.074 0.08 2.3  
K-08-41 58 98.5 40.5 0.063 0.10 2.2  
  104.5 118 13.5 0.062 0.19 10.8  
CT     54 0.063 0.12 4.4  
K-08-42 7 42.5 35.5 0.085 0.11 4  
  48.5 76.5 28 0.073 0.03 0.9  
  91.5 195.5 104 0.063 0.05 1.5  
  201.75 218.45 16.7 0.039 0.09 2 Bottoms in FWT(3)
CT     184.2 0.067 0.06 1.9  
K-08-43 175.5 192 16.5 0.03 0.03 0.7  
  204 223 19 0.031 0.03 1.5  
K-08-44 11.9 52.5 40.6 0.058 0.08 3  
  58.4 76.7 18.3 0.074 0.12 3.1  
  82.5 129.2 46.7 0.042 0.05 1.3  
  137 152 15 0.059 0.07 1.4  
  157.5 192 34.5 0.037 0.07 1.9  
CT     120.6 0.054 0.07 2.2 Bottoms in FWT(3)
K-08-45 generally sub 0.01% Mo, several narrow Cu-rich sections            
K-08-46 140 154.5 14.5 0.076 0.11 4  
  161.1 234.5 73.4 0.071 0.06 1.8  
CT     87.9 0.072 0.07 2.2  
K-08-66 94.9 110.25 15.35 1.67 0.21 11.8  
including 94.9 96.5 1.6 6.83 0.32 14.3  
96.5 98 1.5 0.63 0.24 7.7  
98 99.5 1.5 2.07 0.23 31  
99.5 101 1.5 1.74 0.56 24.9  
101 102.5 1.5 0.58 0.11 4.3  
102.5 104 1.5 0.06 0.06 1.3  
104 105.5 1.5 0.07 0.08 2  
105.5 107 1.5 0.79 0.14 4.9  
107 108.5 1.5 2.16 0.19 11.8  
108.5 110.25 1.75 1.48 0.2 15  
 
 
 
 

 <<Return to Overview

 

Note 1: Intersections in the table above are based on core length but with all holes drilled across the dip of the mineralized zone intersection widths are thought to be close to true widths. Average sample length is 1.5 metres.
Note 2: Where 2 or more composites are shown for a hole, most gaps in the composite values are occupied by lower grade mineralization of 0.01 to 0.04%, or by post-mineral dykes. Post-mineral dykes of less than 5.0 metres width are included in the composite calculations. Post-mineral dykes of greater than 5.0 metres width are excluded in the composite calculations.
Note 3: “FWT” = footwall tonalite
Note 4: “CT” = cumulative total, the weighted average of all composites with the width of post-mineralization, waste-rock dykes greater than five metres in width removed).
*Note 5: Holes K-07-30, K-07-31, K-07-32, and K-07-33 is mostly 0.02% to 0.04% Mo

 

 

 

Seymour Lake
KM61 Area; Moly Project
Overview
KM 61 Drill Hole Results
KM 61 Diamond Drilling Report 2005
 
  Copyright © 2008 - Linear Metals. All rights reserved.       Home | Corporate | Properties | Investors | Contact | Privacy Policy Powered by Norex